Saturday, September 10, 2011

Cross Green on the Staffs and Worcester


This morning we had a slow start as it was not very pleasant weather with very strong wind and light showers. Walked dogs back through bridge 9 and over bridge 10 Avenue bridge to walk a mile or so along the Lower Avenue which was pleasantly sheltered from the wind.

Eventually set off and watered up after 3 miles at Autherley Junction before passing through the stop lock and turning left onto the S&W. finally mooring at end of the 48hr moorings (just out of the trees) after the pub at Cross Green.

No comments:

Post a Comment